Highway tunnel under the Berlin-Moscow railway line

Warsaw, Poland, 2012 | construction methods | on-site

On ground sliding of the highway tunnel under the railway.

  • 63m long sliding in 12 hours.
  • Railway was closed only for 36 hours.
  • Structure weight 10 000t.
  • 9x 1000t. strand jacks used.