Highway tunnel under the Berlin-Moscow railway line Warsaw, Poland, 2012 | construction methods | on-site On ground sliding of the highway tunnel under the railway.63m long sliding in 12 hours.Railway was closed only for 36 hours.Structure weight 10 000t.9x 1000t. strand jacks used.