WK-3 Railway viaduct

Lodz, Poland, 2013 | construction methods | on-site

Side sliding of the 200 meters long fully compleated railway viaduct.  

  • New viaduct was built alongside existing railway line and sled side-wise to minimize down time of the Berlin-Moscow railway line.
  • Length 200m.
  • Weight 7 200t.
  • Installation time 68h.