WK-3 Railway viaduct Lodz, Poland, 2013 | construction methods | on-site Side sliding of the 200 meters long fully compleated railway viaduct. New viaduct was built alongside existing railway line and sled side-wise to minimize down time of the Berlin-Moscow railway line. Length 200m. Weight 7 200t. Installation time 68h.