Steel Bridge heavy lifting - Polaniec

Polaniec, Poland 2014 | construction methods | on-site

Heavy lifting of the steel bridge over Wisla near Polaniec. 

  • Bridge was constructed in 3 segments.
  • Both bank segments have been constructed on land than moved and subsequently lifted on to piers.
  • Central segment was constructed on barge, transported in to position and lifted.