A8 Motorway – stay cable bridge over river Odra WrocLaw, Poland, 2011 | construction methods | on-site Say cable bridge:2 x 256 m main span.Deck was incrementally launched in the same time as pylon was being erected to reduce construction time.Both independent decks suspended to a single pylon.Deck was launched from the same casting yard as one of the approach overpasses.