MS-2 Motorway Ostroda Ostroda, Poland, 2017 | construction methods | on-site Incremental launching of motorway overpasses over swamp.Not accessible terrain.60m spans.Both decks launched from the same casting yard that was moved sideways to minimise production downtime and costs.