MS-2 Motorway Ostroda

Ostroda, Poland, 2017 | construction methods | on-site

Incremental launching of motorway overpasses over swamp.

  • Not accessible terrain.
  • 60m spans.
  • Both decks launched from the same casting yard that was moved sideways to minimise production downtime and costs.